We build family houses near Kraków.
In Pisary, Zabierzów municipality, we are preparing to build four 105.3 m² houses, each with three bedrooms, a terrace and a timber pergola. We have already built two houses of about 200 m² in the same village.
West elevation of house M-1 from the building design, in the facade colours specified in the design.
3D model of house M-1 built from the design drawings: dimensions, windows, roof and facade colours. Drag sideways to rotate it.
In progressWe are now choosing contractors for the water and sewer network and for the houses.
Pisary, Zabierzów municipality
- Houses
- 4 detached, labelled M1, M2, M3, M4
- Floor area
- 105.3 m² per house: 55.0 m² on the ground floor and 50.3 m² upstairs
- Rooms
- living room with dining area, kitchen, 3 bedrooms, walk-in wardrobe, bathroom and WC
- Standard
- developer standard (plastered and screeded, ready for finishing)
- Distances
- about 9 km to Kraków Airport and 19 km to Kraków's Main Square, in a straight line
Stages
March 2023, done
Building design
February 2024, done
Water and sewer connection terms
March–May 2025, done
Water and sewer network design
November–December 2026, now
Choosing contractors
plan: winter 2026/27, planned
Building the water and sewer network
plan: 2027–2028, planned
Building the houses and handover
Our story
AB Invest has been operating since 2019. The company is based in Krzeszowice, about 4 km from Pisary.
In Poland we have already built two family houses, also in Pisary, each of about 200 m². Now we are preparing four more in the same village.
| Village | Scope | Status |
|---|---|---|
| Pisary | 2 family houses, about 200 m² each | Completed |
| Pisary | 4 detached family houses M1–M4, 105.3 m² each, 3 bedrooms, developer standard | In progress |
We buy property
Selling a plot, a house or a flat in or around Kraków? Describe the property and we will prepare a preliminary valuation and a price offer.
For contractors
In November and December 2026 we are choosing two contractors: one for the water and sewer network (about 298 m of water main, 272 m of sewer and 8 connections) and a general contractor for the four houses. To receive the request for quotation, write to us.
Contact
Ask about the Pisary houses or about working with us on the build.
- biuro@abcapital.pl
- Phone
- +48 500 716 005
Company details
AB INVEST sp. z o.o., ul. Żbicka 10A, 32-065 Krzeszowice. KRS 0000799318, NIP 5130261948.